Battery Testing

Full Load Battery Testing.  CEC Callaghan Electrical Contractors performed full load battery testing on protection batteries in 11,000Volt switchroom. This test was performed online so there was no disturbance to…

Read More

Testing and Tagging

Testing and Tagging for the Australian Defense Force. As per AS3760:2010, CEC conducts all testing and tagging using a calibrated tester. Each piece of electrical apparatus, once tested, is entered into…

Read More

Transformer Oil Filtration

CEC Callaghan Electrical Contractors perform On-site Transformer Oil Filtration at a CHPP near Lithgow. After Oil Sampling was completed by CEC. (A disolved Gas analysis, and Oil Quality Data)  it…

Read More
CALL NOW 1300 856 446